Remove Course Remove Minimum Viable Product Remove Product Management Remove Software Review
article thumbnail

Deliver Big Value Quickly with a Small Team

Modus Create

According to research by QSM , the average software project takes almost a year to complete, and includes dozens of unneeded and unused, yet complex features. We had also tested ideas with the users and delivered the first content-based solution MVP (Minimum Viable Product). The Process. The Key to Confidence: Evidence!

article thumbnail

Functional Prototype: How to Iterate with your Software Product

Altexsoft

Prototyping is an essential part of any production, whether you’re developing hardware or software. It can be even coded and designed to some extent, like our x-ray analysis tool. The term prototype is often mixed up with a proof of concept (PoC) and a minimum viable product (MVP). Priority Designs.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Two Sides of Teams

LeanEssays

These are the most important questions for the success of any product, and yet for the longest time, answering these questions have not been considered the responsibility of the development team or the DevOps team. They help you sort through a lot more ideas before starting to code. Or maybe some third party wrote a specification.

article thumbnail

Functional Requirements in Software Development: Types and Best Practices

Altexsoft

In software development, requirements play a crucial role of a project’s North Star, guiding the entire process toward the final goal, so it’s important to understand them and document them properly. In this post, we explore the concept of functional requirements, their types, and how to manage them best.

article thumbnail

Software Development Life Cycle?—?The Ultimate Guide [2020]

Codegiant

Software Development Life Cycle?—?The The Ultimate Guide [2020] [link] The software development life cycle is about producing high-quality software promptly. And your team needs to follow the software development life cycle steps to achieve that. What are the 7 phases of the Software Development Life Cycle?

article thumbnail

Optimizing for iteration speed

Erik Bernhardsson

Manual testing is only done by the product manager, generally when a feature has already been live in production for a while, to make sure that it’s according to the spec. Do we ever release bugs to production? We have built our own system to assign reviewers to pull requests and notifying the Slack channel.

article thumbnail

Optimizing for iteration speed

Erik Bernhardsson

Manual testing is only done by the product manager, generally when a feature has already been live in production for a while, to make sure that it’s according to the spec. Do we ever release bugs to production? We have built our own system to assign reviewers to pull requests and notifying the Slack channel.