Remove Minimum Viable Product Remove Resources Remove Systems Review Remove Technical Advisors
article thumbnail

12 strategic tips CIOs can learn from tech vendor CTOs

CIO

With iterative development, new features can be anticipated and quickly adapted to constantly changing current and future tech, keeping the product relevant to immediate business needs, he says. Brad Porter, CTO, KnowledgeLake KnowledgeLake He advises CIOs to listen to the data and use it to drive decisions.

article thumbnail

Technical Feasibility in Software Engineering: Things to Consider Before Development Starts

Altexsoft

The authorities admitted that the previous 2024 deadline for human landing “ was not grounded on technical feasibility.”. Five key areas to be covered in an overall feasibility study are hidden in the acronym TELOS, popular with product and project managers. What is technical feasibility in more detail?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Functional Prototype: How to Iterate with your Software Product

Altexsoft

The term prototype is often mixed up with a proof of concept (PoC) and a minimum viable product (MVP). You can often find them used interchangeably because every team decides what their validation product will be named for themselves. Feasibility prototype – Testing technical limitations.

article thumbnail

Product Managers vs. Project Managers: Difference, Responsibilities, and KPIs

Altexsoft

Comparing the role of project manager & product manager. First things first, what’s the difference between a project and a product? Project is a process of creating a product or a service. Product is a system that solves some customer’s problem and satisfies market’s demand. Deliverable: iteration review.

article thumbnail

Software Development Life Cycle?—?The Ultimate Guide [2020]

Codegiant

develop large-scale functional business systems in an age of large-scale business conglomerates. Information systems activities revolved around heavy data processing and number crunching routines. You’ll basically have everything your developers need to start working on the actual product. The System design phase?—?You