Remove Engineering Culture Remove Hardware Remove Operating System Remove System Design
article thumbnail

Grown-Up Lean

LeanEssays

Initially this created havoc in operations, which was responsible for any problems that surfaced once code ‘went live’. In other words, a bazaar-style hardware architecture was vastly superior to a cathedral-style architecture.) Each first stage booster has nine Merlin engines, a fuel storage/dispensing system, and four landing legs.