Remove 2040 Remove Hardware Remove Metrics Remove Recruiting
article thumbnail

The mathematical principles of management

Erik Bernhardsson

I’m planning to publish it about 2040, once I’ve mastered all the pieces. Rapid iteration vs long term planning (case study: hardware vs software development). Proxy metrics (optimizing for shareholder value is hard, so let’s pick some metric that’s easier to measure/move but still has a high correlation). A/B testing.

article thumbnail

The mathematical principles of management

Erik Bernhardsson

I’m planning to publish it about 2040, once I’ve mastered all the pieces. Rapid iteration vs long term planning (case study: hardware vs software development). Proxy metrics (optimizing for shareholder value is hard, so let’s pick some metric that’s easier to measure/move but still has a high correlation). A/B testing.