article thumbnail

Micro transformation: Driving big business benefit through quick IT wins

CIO

But by then, the business requirements had changed, “and frankly, it doesn’t work,’’ Mahon says. So Mahon is driving digital transformation in a different direction, doing minimum viable products (MVPs), or micro transformations, which are pieces of a system that are digitized in small increments.

article thumbnail

CIOs rise to the ESG reporting challenge

CIO

“For phases of the strategy that are further away, keep things at a high-level because the path along the way is likely going to make things change.” With that in mind, Mahon moved quickly with his ESG reporting platform to get early user feedback as one would with a minimum viable product. “By

Report 271
article thumbnail

Product-Driven vs. Project Driven: What’s the Difference?

Perficient

The process begins with defining the minimum viable product (MVP) and creating a plan to achieve it. Estimate CR/Next Project vs. Measure Results In a project-driven approach, the focus is to deliver a set of capabilities by a specific deadline.